The short answer

20 states require a permit for every new household well and 11 require a notice or start card — usually with a fee — instead. 8 leave it to counties or towns, and 11 have neither. The most common minimum is 50 ft from the septic tank and 100 ft from the drain field (23 states), and 28 states let owners drill their own well.

Well drilling permit rules by state

Dark blue states require a permit for every new household well; light blue ones require a notice of intent or start card, usually with a fee, instead of a site-reviewed permit; amber ones leave it to counties, towns or districts; grey ones have no state permit or pre-drilling notice. Hover or tap a state for its rule and septic distances.

Loading the map…

Tap a legend entry to show only those states. Small eastern states also have a labelled box on the right. A state colour is the state rule — your county or town can add its own permit.

What the rules add up to

  • 31 states require something before drilling starts. 20 require a permit (California, Colorado, Connecticut, Delaware, Florida, Hawaii, Idaho, Illinois, Iowa, Maryland, Michigan, New Jersey, New Mexico, North Carolina, Ohio, Utah, Vermont, Virginia, West Virginia and Wyoming). 11 require a notice of intent, start card or notification instead — a filing plus a fee in most, not a site-reviewed permit (Alabama, Arizona, Georgia, Minnesota, Montana, Nevada, Oregon, South Carolina, Tennessee, Washington and Wisconsin).
  • 19 states require nothing statewide before drilling. In 8 of them counties, towns or groundwater districts set the rule (Alaska, Indiana, Kansas, Massachusetts, New York, Pennsylvania, Rhode Island and Texas); 11 have no state permit or pre-drilling notice at all (Arkansas, Kentucky, Louisiana, Maine, Mississippi, Missouri, Nebraska, New Hampshire, North Dakota, Oklahoma and South Dakota), though several require the well to be registered or reported afterwards. For Louisiana and Maine the “no” is inferred from the rules — no official source says it outright.
  • Licensed contractors are the norm; owner drilling is common. 49 states require the well to be drilled by a licensed or certified contractor, yet 28 let an owner drill their own well — usually on land they own and live on, sometimes with a permit or bond of their own. 18 don’t, and the rules read were unclear in Alabama, Indiana, Rhode Island and Virginia.
  • Septic tank distances run from 25 to 100 ft; drain field distances from 50 to 150 ft. Tank: 25 ft in 1 state, 50 ft in 35 states, 60 ft in 1 state, 75 ft in 6 states, 100 ft in 6 states. Drain field: 50 ft in 11 states, 70 ft in 1 state, 75 ft in 5 states, 100 ft in 31 states, 150 ft in 1 state. Hawaii sets no statewide number for private wells.
  • The number often depends on the site. 26 states attach conditions — well depth in North Dakota (50 ft; 100 ft if the well is under 100 ft deep), slope in Vermont (drain field 100 ft; if the leachfield is level with or below the well; 200 ft if upslope), soil in Illinois, Oklahoma and Rhode Island, aquifer type or depth in Maryland and South Dakota, how the well is sealed or grouted in Nevada, Texas, Utah and Virginia.
  • The well log is due within 10 to 90 days of completion where a deadline is stated — 30 days in 24 states. The driller files it in most states.

Permits, drillers and well logs, state by state

Select a state to open its card above with the fee, the full rule wording and the source text.

Well drilling permit rules by state
StatePermit before drillingLicensed contractorOwner may drillWell log
AlabamaNotice of intent (no permit)Notice or start card before drillingYesUnclear30 days
AlaskaVaries — no state permit; set locallyNo state permit; set locallyNoYes45 days
ArizonaNotice of intention to drill + fee ($150 or $100)Notice or start card before drillingYesYes30 days
ArkansasNoNo state permit or pre-drilling noticeYesYes90 days
CaliforniaYes — permitPermit required statewideYesNo60 days
ColoradoYes — permitPermit required statewideYesYes60 days
ConnecticutYes — permit ($5 + local fee)Permit required statewideYesNo60 days
DelawareYes — permitPermit required statewideYesNo30 days
FloridaYes — permitPermit required statewideYesYes30 days
GeorgiaNotice of intent (no permit)Notice or start card before drillingYesYesCopy to the owner within 30 days; no state filing
HawaiiYes — permit ($300 (2018 form))Permit required statewideYesNo60 days
IdahoYes — permit ($75)Permit required statewideYesNo30 days
IllinoisYes — permit (up to $100)Permit required statewideYesYes30 days
IndianaVaries — no state permit; set locallyNo state permit; set locallyYesUnclear30 days
IowaYes — permit ($125)Permit required statewideYesYes30 days
KansasVaries — no state permit; set locallyNo state permit; set locallyYesYes30 days
KentuckyNoNo state permit or pre-drilling noticeYesNo60 days
LouisianaNo (inferred from the rules — no official statement)No state permit or pre-drilling noticeYesNo30 days
MaineNo (inferred from the rules — no official statement)No state permit or pre-drilling noticeYesYes30 days
MarylandYes — permitPermit required statewideYesNo45 days
MassachusettsVaries — no state permit; set locallyNo state permit; set locallyYesNoNo deadline stated
MichiganYes — permitPermit required statewideYesYes60 days
MinnesotaNotification + fee ($325)Notice or start card before drillingYesYes60 days
MississippiNoNo state permit or pre-drilling noticeYesYes30 days
MissouriNoNo state permit or pre-drilling noticeYesYes60 days
MontanaWater-right notice of intent + fee ($400)Notice or start card before drillingYesYes60 days
NebraskaNoNo state permit or pre-drilling noticeYesYes60 days
NevadaNotice of intent (needs approval) + fee (amount not recorded)Notice or start card before drillingYesNo30 days
New HampshireNoNo state permit or pre-drilling noticeYesYes90 days
New JerseyYes — permit ($130)Permit required statewideYesNo90 days
New MexicoYes — permit ($125)Permit required statewideYesNo20 days (domestic well)
New YorkVaries — no state permit; set locallyNo state permit; set locallyYesNoNo deadline stated
North CarolinaYes — permitPermit required statewideYesYes30 days
North DakotaNoNo state permit or pre-drilling noticeYesYes30 days
OhioYes — permitPermit required statewideYesYes30 days
OklahomaNoNo state permit or pre-drilling noticeYesYes60 days for licensed drillers
OregonStart card + fee ($490)Notice or start card before drillingYesYes30 days
PennsylvaniaVaries — no state permit; set locallyNo state permit; set locallyYesYesNo deadline stated
Rhode IslandVaries — no state permit; set locallyNo state permit; set locallyYesUnclear10 days
South CarolinaNotice of intent (general permit) + fee ($70)Notice or start card before drillingYesNo30 days
South DakotaNoNo state permit or pre-drilling noticeYesYesNo deadline stated
TennesseeNotice of intent + fee ($75)Notice or start card before drillingYesNo60 days
TexasVaries — no state permit; set locallyNo state permit; set locallyYesYes60 days
UtahYes — permitPermit required statewideYesNo30 days
VermontYes — permitPermit required statewideYesNo90 days
VirginiaYes — permit ($300)Permit required statewideYesUnclear30 days
WashingtonNotice of intent (start card) + fee ($200)Notice or start card before drillingYesYes30 days
West VirginiaYes — permitPermit required statewideYesNo30 days
WisconsinNotification + fee ($50.50)Notice or start card before drillingYesYes30 days
WyomingYes — permit ($50)Permit required statewideYesYes30 days, filed by the owner (U.W. 6)

How far a well must be from a septic system

The minimum horizontal distance from a household well to the septic tank and to the drain field (leach field, absorption area), as each state’s rule states it. Where the rule changes the number for depth, soil, slope or how the well is built, the condition is shown with the figure. Your county can require more.

Minimum distance from a private well to a septic tank and drain field, by state
StateTo septic tankTo drain field
Alabama50 ft100 ft100 ft; 50 ft for some older lots (established before Mar 18, 1982)
Alaska100 ft100 ft
Arizona100 ft100 ft
Arkansas100 ft100 ft; more in pervious formations (doubled in highly pervious gravel)100 ft100 ft; more in pervious formations (doubled in highly pervious gravel)
California100 ft100 ft
Colorado50 ft100 ft
Connecticut75 ft75 ft; for a well under 10 gpm (150 ft for 10–50 gpm)75 ft75 ft; for a well under 10 gpm (150 ft for 10–50 gpm)
Delaware50 ft100 ft100 ft; can be 50 ft for a pressure-grouted well in a confined aquifer
Florida75 ft75 ft
Georgia50 ft100 ft
Hawaii—No statewide number for private wells—No statewide number for private wells
Idaho50 ft100 ft
Illinois50 ft50 ft; clay and loam soils only; set case by case in sand and other soils75 ft75 ft; clay and loam soils only; set case by case in sand and other soils
Indiana50 ft50 ft50 ft; doubled where a shallow soil layer has a high loading rate
Iowa50 ft100 ft
Kansas50 ft50 ft; legal minimum (KDHE recommends more than 100 ft)50 ft50 ft; legal minimum (KDHE recommends more than 400 ft)
Kentucky50 ft50 ft; doubled where the soil above rock is under 20 ft of mostly sand or gravel70 ft70 ft; from the side of a lateral trench or bed; doubled where the soil above rock is under 20 ft of mostly sand or gravel
Louisiana50 ft50 ft50 ft; the general rule is 100 ft, which may be reduced to 50 ft for household wells
Maine60 ft100 ft100 ft; bedrock wells may reduce it by casing depth, to no less than 60 ft
Maryland100 ft100 ft; 50 ft if the well draws from a confined aquifer (the 100 ft is for an unconfined aquifer)100 ft100 ft; 50 ft if the well draws from a confined aquifer (the 100 ft is for an unconfined aquifer)
Massachusetts50 ft100 ft
Michigan50 ft50 ft
Minnesota50 ft50 ft50 ft; 100 ft for a 'sensitive' (shallow-cased) well
Mississippi50 ft100 ftThe statute is set to be repealed July 1, 2028 unless it is reenacted again.
Missouri50 ft100 ft
Montana50 ft100 ft
Nebraska50 ft100 ft
Nevada100 ft100 ft100 ft; 150 ft if the well is not sealed to 50 ft
New Hampshire75 ft75 ft; a protective radius — can be 50 ft with a watertight tank and SDR 26 pipe75 ft75 ft; a protective radius, for flows up to 750 gpd
New Jersey50 ft100 ft
New Mexico50 ft100 ft
New York50 ft50 ft; increased by 50% if water enters the well less than 50 ft down100 ft100 ft; increased by 50% if water enters the well less than 50 ft down
North Carolina50 ft50 ft; 100 ft if the septic system is in saprolite (well rule; the septic rule says 50 ft)50 ft50 ft; 100 ft if the septic system is in saprolite (well rule; the septic rule says 50 ft)
North Dakota50 ft50 ft; 100 ft if the well is under 100 ft deep50 ft50 ft; 100 ft if the well is under 100 ft deep
Ohio50 ft50 ft
Oklahoma50 ft50 ft; 100 ft in fast-draining or Group 1 soils; an OWRB rule also asks 75 ft (level) to 100 ft (down-gradient) — the two rules conflict50 ft50 ft; 100 ft in fast-draining or Group 1 soils; an OWRB rule also asks 75 ft (level) to 100 ft (down-gradient) — the two rules conflict
Oregon50 ft100 ft
Pennsylvania50 ft50 ft; septic-siting rule; Pennsylvania has no state well-siting rule100 ft100 ft; septic-siting rule; Pennsylvania has no state well-siting rule
Rhode Island75 ft100 ft100 ft; 150 ft for a system designed for Category 1 soils
South Carolina75 ft75 ft
South Dakota75 ft75 ft; aquifer top under 100 ft deep; 50 ft for a deeper aquifer150 ft150 ft; aquifer top under 100 ft deep; 100 ft for a deeper aquifer
Tennessee50 ft50 ft
Texas50 ft100 ft100 ft; 50 ft if the well is cemented to at least 100 ft, except in the Edwards Aquifer
Utah50 ft100 ft100 ft; 200 ft for an ungrouted well or spring
Vermont50 ft100 ft100 ft; if the leachfield is level with or below the well; 200 ft if upslope
Virginia50 ft100 ft100 ft; for most wells (Class IIIC); 50 ft for Class IIIA/IIIB wells cased and grouted deeper
Washington50 ft100 ft
West Virginia50 ft50 ft; 100 ft if the well is lower than the tank100 ft
Wisconsin25 ft50 ft
Wyoming50 ft100 ft

Some of these come from the septic-siting rule rather than a well rule — in Pennsylvania there is no state well-siting rule at all — and a few states have two rules that disagree; the card for each state says which rule the figure comes from and quotes both. Siting a well is also where the cost of drilling starts: a lot that can’t meet the distances may need a deeper, grouted well or a variance.

Methodology and limits

Official sources only. Every value comes from a state statute, a state regulation or a state agency’s own page. Each is backed by verbatim quotes from its source, shown under “View the rule text” in the state card.

Independently verified. A second pass re-fetched every cited source and matched each quote against the live text on September 26, 2026. It changed answers: a statute that exempts owners where an agency page said everyone needs a licence (Arkansas, Georgia), a missing registration fee filled in from the statute (Nebraska), rules found to have been readopted and renumbered (New Hampshire), and a wrong setback exemption removed (Virginia).

Permit versus notice. We call something a permit only when the state issues one. A notice of intent, start card or notification that you file with a fee is labelled that way, even where the state’s own shorthand calls it a permit. Where the verified answer is inferred from the rules rather than stated, the card says so.

Limits. County, town and district rules were not surveyed exhaustively — many counties add a permit, a fee or larger setbacks. Where a fee or rule is dated, the card shows the date; fees change. This is a research summary, not legal advice: the permitting authority’s word is final, so confirm with it before you drill.

Download or cite the data

The full table — permit type and label, issuer, fee, contractor and owner rules, setbacks with their conditions, well-log filing and source URLs for every state — is free to reuse under CC BY 4.0: credit Well Water Fixes with a link to this page. Testing rules and free programs are on well water testing by state.

Download the CSV (87 KB)

Cite this data

Well Water Fixes (2026). Private well drilling rules by state: permits, fees, drillers and septic setbacks, verified against official sources September 26, 2026. https://www.wellwaterfixes.com/well-drilling-permit-by-state

Frequently asked questions

Do I need a permit to drill a well?
In 20 states, yes — a permit is required statewide. In 11 more you file a notice of intent or start card, usually with a fee, instead. 8 states leave it to counties, towns or groundwater districts, and 11 have no state permit or pre-drilling notice, though counties can add their own. Pick your state above for who issues it and the fee.
How far does a well have to be from a septic tank?
It depends on the state: from 25 ft (Wisconsin) to 100 ft (Alaska, Arizona, Arkansas, California, Maryland and Nevada), and 50 ft in most. Drain fields need more — usually 100 ft, and up to 150 ft in South Dakota. Many states change the number for well depth, soil or slope, and counties can require more.
Can I drill my own well?
In 28 states, yes — the licensing law exempts owners, usually for a well on land they own and live on. Some add conditions: Oregon requires a landowner permit and bond, Montana a permit from its contractors' board, Florida limits it to wells 2 inches or smaller. 18 states require a licensed driller for every well. Owner-drilled wells still need any permit, construction standards and setbacks.
How much does a well drilling permit cost?
Where the state sets it: Wyoming charges $50 for a domestic well, Idaho $75, New Mexico $125, New Jersey $130 and Virginia $300; Minnesota's notification is $325 and Oregon's start card $490. Many states leave the fee to the county. The state card gives the fee with its date and source.
Who files the well log after drilling?
Usually the driller, with the state agency, within 10 to 90 days — 30 days is the most common deadline. In Wyoming the owner files the completion statement, and in Georgia the contractor gives the owner a copy with no state filing.